Title: Revived project of Soaraja Peranginan Sg. Rambah, Pontian as the ‘Istana Hinggap’

Client: DYMM Sultan Ibrahim

Project Cost: RM6.10 million

 

StatusPending

Description:

ISI and KALAM (Centre for the Study of Built Environment in the Malay World) Faculty of Built Environment, UTM had been asked to prepare a proposal for a new ‘Istana Hinggap’ by the Pejabat DiRaja Istana Johor. ISI is expected to assume the role of a Project Manager. At the preliminary stage, it will begin to form the consultant team and prepare the work scope, project time frame and contractual matters. ISI will need to become a JV Partner to a contractor during the construction stage similar to procurement method adopted for UTM-SPACE Project. ISI is also asked to include interior design and provide the additional cost involved.